Never a day off at Mainline!

On Wednesday 21st December we had a big dilemma!

Most of Swadlincote had woke up in darkness due to a power cut.

The power was off between 6:00a.m. and 9:00a.m. which is a critically busy time operationally for Mainline. Our focus was to retain our service levels.

Within about 25 minutes, we had connected a 110Kva Generator, powered it up and we were up and running as if nothing had happened!

Generators are available for both sites and events.  Businesses should include a backup generator as part of  their contingency planning.

Eliminate your single point of failure, hire a Generator from Mainline!