Case Studies

Mainline Powers Burton Hospital

The Project
Burton Hospital required a critical back-up power solution and got in touch with Mainline to hire two generators for the project.

The Challenge
The hospital’s main switch gear required an upgrade and testing.

The Solution
Mainline provided the hospital with critical power and the right backup solution in order to avoid any disruption during the project.

Mainline used two 110kva synchronised generators which provided the critical power back up. Mainline’s specialist installation and decommissioning team offered emergency out of hours cover which was crucial for the hospital. All equipment was delivered and collected directly to and from the hospital. Overall, the project ran smoothly without any disruption.